1. Description
It is designed to set the calendar working time relative to the working week.
The table on the Work Week page consists of entries for each day of the week.
Consists of columns:
- Name;
- Start;
- End;
- State;
- Tools for action.
Fig. 1. Working week tab
1.1. Name
The name of the day of the week is displayed here. If the day is not shown, then the entry is relevant for the day indicated above (Fig.2).
Fig. 2. Several periods for one day
1.2. Start
The Start column consists of two fields that indicate the interval's start time. In the first field, enter hours; in the second field, enter minutes.
1.3. End
The End column consists of two fields that indicate the interval's end time. In the first field, enter hours; in the second field, enter minutes.
1.4. State
The switch is responsible for enabling and disabling the work of the calendar in this time interval.
- the calendar is included;
- the calendar is disabled.
1.5. Tools for action
There are two tools:
- add tool;
- removal tool.
1.5.1. Add tool
It appears for master records that have a day's name.
When you click the add button, a new entry is added for this day without showing the day.
Attention!
The added entry must have a time interval that does not include the time entered in other entries for that day.
1.5.2. Removal tool
It is displayed for additional entries. The additional entries do not have a day's name (Fig. 2). Clicking the button deletes the entry.
2. Opportunities
2.1. Create a new Holiday
Goal | Create a new Holiday |
---|---|
Preconditions |
|
Steps |
|
Result | Data saved. Holiday is created |
0 Comments